This Zachary homeowner had reached the point most Louisiana homeowners eventually reach: the roof was still holding, but it had run out of service life. Rather than patch it through another hurricane season, they opted for a complete tear-off and replacement in July 2026. Roof Rescue LLC handled the project from delivery to final clean-up over three consecutive days.
Every replacement we do starts by getting the old roof off and looking at what is underneath. Decking condition is not something you can assess from the ground or from a drone photo. On this home the crew stripped the field down to the deck, inspected it, and addressed what needed addressing before a single new shingle went down. Covering questionable decking with a good roof is how a thirty-year system turns into a ten-year problem.
This is exactly the kind of thing you only find once the shingles are off. The old roof had more than a single layer of felt underneath it, across roughly 53 squares, which means at some point this roof had been built up rather than taken back to the deck.
Layers hide problems and they add weight the structure was never designed to carry. Finding it is the argument for a real tear-off in one sentence. It also has to be priced honestly when it turns up, which is why our contract spells out what happens if extra layers are found rather than leaving it as a surprise conversation on day two.
Decking repair on this job was not hypothetical. Boards came out and new material went in before the roof was dried in, and the fascia and soffit were repaired as part of the same scope. That is the work that never shows up in a finished photo and decides whether the roof lasts its full service life.
At roughly 47 squares on a 7/12 to 9/12 pitch, this was not a walk-around ranch roof. That pitch range is steep enough to change how a crew moves, how material is staged, and how long the job honestly takes. Any roofer quoting a steep roof at flat-roof speed is quoting something they cannot deliver.
The new roof is a CertainTeed Landmark architectural shingle system. Landmark is a dimensional shingle, so it carries more weight per square than a three-tab, holds up better under gulf storm wind, and gives the roof depth and shadow line rather than a flat sheet of colour.
Most roofs do not fail in the middle of the field. They fail at the penetrations. Every vent pipe, flue and roof vent on this home was re-flashed as part of the replacement rather than reused, and a continuous ridge vent was run to let the attic breathe. Ventilation is the least visible part of a roof replacement and one of the most consequential, because an attic that cannot exhaust heat cooks the shingles from underneath.
Materials landed on site, the tear-off and dry-in happened, the new system went on, and the crew cleaned up. For a replacement of this size and pitch that is a realistic timeline, and it is the one we quote rather than an optimistic one we cannot hold.
Thinking about a replacement on your own home? Schedule a free inspection and we will give you a straight assessment of what your roof actually needs, including if the answer is that it can wait. We also handle roof replacement across Zachary and the wider Baton Rouge area.